QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2014-07-07 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 8550.000 |
True vertical depth | 7301.000 |
Tperf | 5800.000 |
Bperf | 8426.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Active well |
Service company | Halliburton |
Tool | ARRAY COMPENSATED TRUE RESISTIVITY DUAL SPACED NEUTRON SPECTRAL DENSITY 5"=100" |
Date | 2014-07-14 |
Run number | One |
Driller depth | 8550.000 |
Logger depth | 8550.000 |
Log bottom | 8538.000 |
Log top | 1335.000 |
Casing size | 10.750 |
Bit size | 8.750 |
Mud type | LSND |
Mud density | 10.60 |
Mud visc (plastic) | |
Mud visc (funnel) | 45.00 |
Mud ph | 8.00 |
Mud fluid loss | 4.70 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | 03:40:00 |
Time since circulation | 7.000 |
Operating rig time | |
Notes |
31059 | 2018-05-15 12:33 | francisco | CLOSED, UNHANDED |
31059 | 2018-05-15 12:33 | francisco | EDITED WELL METADATA |
31059 | 2018-05-15 12:32 | francisco | EDITED RUN One (July 14, 2014) |
31059 | 2018-05-15 12:30 | francisco | TAKEN |
31059 | 2018-01-10 16:23 | whdc | TASK CREATED |
22329 | 2018-01-09 14:49 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
22329 | 2018-01-09 14:49 | TASK CREATED | |
5412 | 2017-11-21 14:23 | eramirez | CLOSED, UNHANDED |
5412 | 2017-11-21 14:23 | eramirez | EDITED RUN One (July 14, 2014) |
5412 | 2017-11-21 14:23 | eramirez | EDITED RUN One (July 14, 2014) |
5412 | 2017-11-21 14:22 | eramirez | ADDED RUN One (July 14, 2014) |
5412 | 2017-11-21 14:20 | eramirez | TAKEN |
5412 | 2017-10-05 09:53 | mloustale | TASK CREATED |
22329 | 2017-01-12 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
22329 | 2017-01-12 23:53 | dakota | EDITED WELL METADATA (SHAREPOINT) |
Well 03055291