LOG IN / HELP

<<< BACK TO JOB

Elk Hills QC: 02927085

QC all data (well construction, run header, g-log curves, mud/temperature).

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 1948-02-01
Abandon date 2009-01-07
Borehole orientation Vertical
Measured depth 9495.000
True vertical depth
Tperf
Bperf
Water geochem
No well data
Glog unavailable
Notes No perf info

Run headers

Service company Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger Schlumberger
Tool ELECTRIC LOG ELECTRIC LOG ELECTRIC LOG ELECTRIC LOG ELECTRIC LOG ELECTRIC LOG ELECTRIC LOG ELECTRIC LOG
Date 1948-02-09 1948-03-02 1948-03-17 1948-04-08 1948-05-01 1948-06-08 1948-07-08 1948-08-27
Run number 1 2 3 4 5 6 7 8
Driller depth 2700.000 6469.000 7182.000 7700.000 8010.000 8570.000 9064.000 9495.000
Logger depth 2701.000 6470.000 7182.000 7701.000 8007.000 8570.000 9072.000 9496.000
Log bottom 2700.000 6470.000 7181.000 7700.000 8006.000 8570.000 9071.000 9495.000
Log top 0.000 2700.000 6470.000 7181.000 7700.000 8000.000 8570.000 9071.000
Casing size
Bit size 8.500 8.500 8.500 8.500 8.500 8.500 8.500 8.500
Mud type Rodgers Lake Pyro Queb P-34 Pyro Pyro Queb RogLake Aero McKittrick Natural Pyro Queb
Mud density 78.00 81.00 86.00 87.00 86.00 86.00 86.00 88.00
Mud visc (plastic) 58.00 60.00 52.00 68.00 64.00 84.00 55.00 87.00
Mud visc (funnel)
Mud ph
Mud fluid loss
Sample source
Circulation stopped time
Logger on bottom time
Time since circulation
Operating rig time 1.000 3.000 2.000 2.500 1.750 2.000 2.500 2.500
Notes

G-log curves

1948-02-09 1
AM 10"
OA 19'
OA 8 1/2'
1948-03-02 2
AM 10"
OA 10'
OA 19'
1948-03-17 3
AM 10"
OA 10'
OA 19'
1948-04-08 4
AM 10"
OA 10'
OA 19'
1948-05-01 5
AM 10"
OA 10'
OA 19'
1948-06-08 6
AM 10"
OA 10'
OA 19'
1948-07-08 7
AM 10"
OA 10'
OA 19'
1948-08-27 8
AM 10"
OA 10'
OA 19'

Temperature and mud resistivity observations

1948-02-09 1
Rm = 1.600 Ωm @ 61.000 °F
1948-03-02 2
Rm = 1.700 Ωm @ 5.000 °F
1948-03-17 3
Rm = 2.200 Ωm @ 60.000 °F
1948-04-08 4
Rm = 1.800 Ωm @ 68.000 °F
1948-05-01 5
Rm = 1.100 Ωm @ 88.000 °F
1948-06-08 6
Rm = 1.120 Ωm @ 88.000 °F
1948-07-08 7
Rm = 1.200 Ωm @ 62.000 °F
1948-08-27 8
Rm = 1.500 Ωm @ 118.000 °F

Change log


31193 2018-05-20 12:27 dakota CLOSED, UNHANDED
31193 2018-05-20 12:25 dakota EDITED WELL METADATA
31193 2018-05-20 12:22 dakota TAKEN
22199 2018-01-10 17:06 ashley CLOSED, UNHANDED
22199 2018-01-10 17:06 ashley EDITED WELL METADATA
22199 2018-01-10 17:03 ashley TAKEN
31193 2018-01-10 16:23 whdc TASK CREATED
22199 2018-01-09 14:49 CONFLICT notes: perf data unavailable <> No perfs
22199 2018-01-09 14:49 CONFLICT borehole_orientation: V <> D
22199 2018-01-09 14:49 CONFLICT abandon_date: 2009-01-06 <> 2009-01-07
22199 2018-01-09 14:49 SHAREPOINT IMPORT (mu4) water_geochem
22199 2018-01-09 14:49 TASK CREATED
5281 2017-11-19 10:25 fatimaburhan CLOSED, UNHANDED
5281 2017-11-19 10:25 fatimaburhan TAKEN
5281 2017-10-05 09:53 mloustale TASK CREATED
1917 2017-09-15 11:46 hannaho CLOSED, UNHANDED
1917 2017-09-15 11:46 hannaho ADDED RUN 8 (Aug. 27, 1948)
1917 2017-09-15 11:44 hannaho ADDED RUN 7 (July 8, 1948)
1917 2017-09-15 11:41 hannaho ADDED RUN 6 (June 8, 1948)
1917 2017-09-15 11:36 hannaho ADDED RUN 5 (May 1, 1948)
1917 2017-09-15 11:33 hannaho ADDED RUN 4 (April 8, 1948)
1917 2017-09-15 11:28 hannaho EDITED RUN 3 (March 17, 1948)
1917 2017-09-15 11:27 hannaho ADDED RUN 3 (March 17, 1948)
1917 2017-09-15 11:25 hannaho ADDED RUN 2 (March 2, 1948)
1917 2017-09-15 11:21 hannaho ADDED RUN 1 (Feb. 9, 1948)
1917 2017-09-15 11:15 hannaho EDITED WELL METADATA
1917 2017-09-15 11:03 hannaho TAKEN
1917 2017-09-11 17:49 whdc TASK CREATED
22199 2017-01-11 23:53 sharepoint-RC EDITED WELL METADATA (SHAREPOINT)
22199 2017-01-11 23:53 ashley CHECKED WELL METADATA (SHAREPOINT)

Well versions and related tasks

Well 02927085