QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2009-10-23 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 7788.000 |
True vertical depth | 7757.020 |
Tperf | 5834.000 |
Bperf | 7710.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Halliburton |
Tool | HIGH RESOLUTION INDUCTION |
Date | 2009-10-30 |
Run number | ONE |
Driller depth | 7788.000 |
Logger depth | 7779.000 |
Log bottom | 7767.000 |
Log top | 1372.000 |
Casing size | 9.625 |
Bit size | 8.750 |
Mud type | GEL/SP-101 |
Mud density | 11.00 |
Mud visc (plastic) | |
Mud visc (funnel) | 49.00 |
Mud ph | 8.00 |
Mud fluid loss | 3.60 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | 16:15:00 |
Time since circulation | 7.000 |
Operating rig time | |
Notes |
31916 | 2018-06-15 13:59 | ashley | CLOSED, UNHANDED |
31916 | 2018-06-15 13:59 | ashley | EDITED RUN ONE (Oct. 30, 2009) |
31916 | 2018-06-15 13:56 | ashley | EDITED WELL METADATA |
31916 | 2018-06-15 13:54 | ashley | TAKEN |
31916 | 2018-01-10 16:23 | whdc | TASK CREATED |
21475 | 2018-01-09 14:48 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
21475 | 2018-01-09 14:48 | TASK CREATED | |
4550 | 2017-11-09 16:16 | eramirez | CLOSED, UNHANDED |
4550 | 2017-11-09 16:16 | eramirez | EDITED RUN ONE (Oct. 30, 2009) |
4550 | 2017-11-09 16:15 | eramirez | ADDED RUN ONE (Oct. 30, 2009) |
4550 | 2017-11-09 16:13 | eramirez | TAKEN |
4550 | 2017-10-05 09:53 | mloustale | TASK CREATED |
21475 | 2017-01-03 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
21475 | 2017-01-03 23:53 | sharepoint-LR | EDITED WELL METADATA (SHAREPOINT) |
Well 03039304