QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1952-09-10 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 6625.000 |
True vertical depth | |
Tperf | 5410.000 |
Bperf | 6517.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger | Schlumberger | Schlumberger | Schlumberger | Schlumberger | Schlumberger |
Tool | ELECTRICAL LOG | ELECTRICAL LOG | ELECTRICAL LOG | ELECTRICAL LOG | DUAL INDUCTION SFL | COMPENSATED NEUTRON-LITHO DENSITY |
Date | 1952-09-16 | 1952-09-29 | 1952-10-04 | 1952-10-05 | 1988-05-09 | 1988-05-09 |
Run number | 1 | 2 | INDUCTION | SCRATCHER | ONE | ONE |
Driller depth | 2920.000 | 5328.000 | 2800.000 | 5800.000 | 6625.000 | 6625.000 |
Logger depth | 2920.000 | 5331.000 | 5798.000 | 5798.000 | 6629.000 | 6629.000 |
Log bottom | 2919.000 | 5330.000 | 5794.000 | 5798.000 | 6623.000 | 6626.000 |
Log top | 212.000 | 2920.000 | 5330.000 | 5330.000 | 5804.000 | 5804.000 |
Casing size | 7.000 | 7.000 | ||||
Bit size | 15.000 | 9.750 | 9.725 | 9.750 | 6.125 | 6.125 |
Mud type | CLAY BASE | CLAY BASE | JEL OIL | JEL OIL | HEC/POLYMER | HEC/POLYMER |
Mud density | 77.00 | 86.00 | 89.00 | 89.00 | 67.00 | 67.00 |
Mud visc (plastic) | 70.00 | 54.00 | 108.00 | 108.00 | ||
Mud visc (funnel) | 47.00 | 47.00 | ||||
Mud ph | 7.00 | 8.00 | 7.70 | 7.70 | ||
Mud fluid loss | 6.00 | 6.00 | ||||
Sample source | CIRCULATED | FLOWLINE | ||||
Circulation stopped time | 11:30:00 | 11:30:00 | ||||
Logger on bottom time | 16:03:00 | 18:30:00 | ||||
Time since circulation | ||||||
Operating rig time | 1.750 | 1.250 | 2.000 | 1.000 | ||
Notes | Density is in L/F3; Fluid Loss is in C3 | Density is in L/F3; Fluid Loss is in C3 |
31959 | 2018-06-15 16:03 | ashley | CLOSED, UNHANDED |
31959 | 2018-06-15 16:03 | ashley | EDITED RUN ONE (May 9, 1988) |
31959 | 2018-06-15 16:02 | ashley | EDITED RUN ONE (May 9, 1988) |
31959 | 2018-06-15 15:58 | ashley | EDITED RUN ONE (May 9, 1988) |
31959 | 2018-06-15 15:56 | ashley | EDITED RUN One (May 9, 1988) |
31959 | 2018-06-15 15:56 | ashley | ADDED RUN ONE (May 9, 1988) |
31959 | 2018-06-15 15:52 | ashley | EDITED RUN INDUCTION (Oct. 4, 1952) |
31959 | 2018-06-15 15:50 | ashley | EDITED RUN SCRATCHER (Oct. 5, 1952) |
31959 | 2018-06-15 15:48 | ashley | EDITED RUN 1 (Sept. 16, 1952) |
31959 | 2018-06-15 15:48 | ashley | EDITED RUN 2 (Sept. 29, 1952) |
31959 | 2018-06-15 15:45 | ashley | EDITED RUN 1 (Sept. 16, 1952) |
31959 | 2018-06-15 15:42 | ashley | EDITED WELL METADATA |
31959 | 2018-06-15 15:35 | ashley | TAKEN |
31959 | 2018-01-10 16:23 | whdc | TASK CREATED |
21426 | 2018-01-09 14:48 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
21426 | 2018-01-09 14:48 | TASK CREATED | |
4501 | 2017-11-09 14:41 | eramirez | CLOSED, UNHANDED |
4501 | 2017-11-09 14:41 | eramirez | ADDED RUN INDUCTION (Oct. 4, 1952) |
4501 | 2017-11-09 14:40 | eramirez | ADDED RUN SCRATCHER (Oct. 5, 1952) |
4501 | 2017-11-09 14:37 | eramirez | EDITED RUN 1 (Sept. 16, 1952) |
4501 | 2017-11-09 14:37 | eramirez | ADDED RUN 2 (Sept. 29, 1952) |
4501 | 2017-11-09 14:36 | eramirez | ADDED RUN 1 (Sept. 16, 1952) |
4501 | 2017-11-09 14:33 | eramirez | TAKEN, REOPENED |
4501 | 2017-11-09 14:33 | eramirez | CLOSED, UNHANDED |
4501 | 2017-11-09 14:33 | eramirez | EDITED RUN ONE (May 9, 1988) |
4501 | 2017-11-09 14:32 | eramirez | ADDED RUN ONE (May 9, 1988) |
4501 | 2017-11-09 14:30 | eramirez | EDITED RUN One (May 9, 1988) |
4501 | 2017-11-09 14:29 | eramirez | ADDED RUN One (May 9, 1988) |
4501 | 2017-11-09 14:27 | eramirez | TAKEN |
4501 | 2017-10-05 09:53 | mloustale | TASK CREATED |
21426 | 2017-01-02 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
21426 | 2017-01-02 23:53 | sharepoint-JG | EDITED WELL METADATA (SHAREPOINT) |
Well 02927272