QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2006-12-14 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 4323.000 |
True vertical depth | 4280.790 |
Tperf | 2641.000 |
Bperf | 4136.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Halliburton |
Tool | HIGH RESOLUTION INDUCTION 2"=100' |
Date | 2006-12-19 |
Run number | ONE |
Driller depth | 4323.000 |
Logger depth | 4300.000 |
Log bottom | 4290.000 |
Log top | 1181.000 |
Casing size | 9.625 |
Bit size | 9.875 |
Mud type | GEL/CYPAN |
Mud density | 10.10 |
Mud visc (plastic) | 41.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 5.60 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | 12:15:00 |
Time since circulation | 7.000 |
Operating rig time | |
Notes |
32099 | 2018-06-12 12:37 | ashley | CLOSED, UNHANDED |
32099 | 2018-06-12 12:37 | ashley | EDITED RUN ONE (Dec. 19, 2006) |
32099 | 2018-06-12 12:35 | ashley | EDITED WELL METADATA |
32099 | 2018-06-12 12:31 | ashley | TAKEN |
32099 | 2018-01-10 16:23 | whdc | TASK CREATED |
21317 | 2018-01-09 14:48 | SHAREPOINT IMPORT (mu2) spud_date,tperf,measured_depth,water_geochem,borehole_orientation,notes | |
21317 | 2018-01-09 14:48 | TASK CREATED | |
4391 | 2017-11-08 10:40 | francisco | CLOSED, UNHANDED |
4391 | 2017-11-08 10:40 | francisco | EDITED RUN ONE (Dec. 19, 2006) |
4391 | 2017-11-08 10:39 | francisco | ADDED RUN ONE (Dec. 19, 2006) |
4391 | 2017-11-08 10:38 | francisco | TAKEN |
4391 | 2017-10-05 09:53 | mloustale | TASK CREATED |
21317 | 2017-01-01 23:53 | ashley | CHECKED WELL METADATA (SHAREPOINT) |
21317 | 2017-01-01 23:53 | sharepoint-RMB | EDITED WELL METADATA (SHAREPOINT) |
Well 03032005