QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1956-08-07 |
Abandon date | 1978-11-30 |
Borehole orientation | Vertical |
Measured depth | 1170.000 |
True vertical depth | |
Tperf | 561.000 |
Bperf | 1103.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Lane wells | Lane Wells |
Tool | Electrolog | Electrolog |
Date | 1956-08-07 | 1956-08-10 |
Run number | 1 | 2 |
Driller depth | 570.000 | 1170.000 |
Logger depth | 570.000 | 1170.000 |
Log bottom | 570.000 | 1170.000 |
Log top | 80.000 | 572.000 |
Casing size | ||
Bit size | 12.250 | 9.875 |
Mud type | CLAY BASE | EMULSION |
Mud density | 78.00 | 78.00 |
Mud visc (plastic) | 55.00 | 48.00 |
Mud visc (funnel) | ||
Mud ph | ||
Mud fluid loss | 4.00 | |
Sample source | ||
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | ||
Operating rig time | 0.750 | 2.000 |
Notes |
34051 | 2018-03-13 17:13 | ashley | CLOSED, UNHANDED |
34051 | 2018-03-13 17:13 | ashley | EDITED RUN 2 (Aug. 10, 1956) |
34051 | 2018-03-13 17:12 | ashley | EDITED RUN 1 (Aug. 7, 1956) |
34051 | 2018-03-13 17:10 | ashley | EDITED WELL METADATA |
34051 | 2018-03-13 17:08 | ashley | TAKEN |
34051 | 2018-03-09 13:59 | e.haugen | TASK CREATED |
33039 | 2018-03-07 12:06 | powen | CLOSED, UNHANDED |
33039 | 2018-03-07 12:06 | powen | ADDED RUN 2 (Aug. 10, 1956) |
33039 | 2018-03-07 11:59 | powen | ADDED RUN 1 (Aug. 7, 1956) |
33039 | 2018-03-07 11:51 | powen | EDITED WELL METADATA |
33039 | 2018-03-07 11:45 | powen | TAKEN |
33039 | 2018-02-20 07:39 | e.haugen | TASK CREATED |
Well 03713904