QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1954-02-04 |
Abandon date | 2002-05-06 |
Borehole orientation | Vertical |
Measured depth | 1450.000 |
True vertical depth | |
Tperf | 840.000 |
Bperf | 1279.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | Electrical Log |
Date | 1954-02-11 |
Run number | 1 |
Driller depth | 1450.000 |
Logger depth | 1446.000 |
Log bottom | 1445.000 |
Log top | 80.000 |
Casing size | |
Bit size | 12.250 |
Mud type | Lube_seal |
Mud density | 72.00 |
Mud visc (plastic) | 70.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 3.50 |
Sample source | |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | 1.000 |
Notes | Fluid loss is in "CC 30 min." not "mL/30 min" |
36618 | 2018-03-27 10:34 | ashley | CLOSED, UNHANDED |
36618 | 2018-03-27 10:34 | ashley | EDITED RUN 1 (Feb. 11, 1954) |
36618 | 2018-03-27 10:32 | ashley | EDITED WELL METADATA |
36618 | 2018-03-27 10:27 | ashley | TAKEN |
36618 | 2018-03-20 11:59 | whdc | TASK CREATED |
33304 | 2018-03-13 16:27 | powen | CLOSED, UNHANDED |
33304 | 2018-03-13 16:27 | powen | ADDED RUN 1 (Feb. 11, 1954) |
33304 | 2018-03-13 16:25 | powen | EDITED WELL METADATA |
33304 | 2018-03-13 16:21 | powen | TAKEN |
33304 | 2018-02-20 07:39 | e.haugen | TASK CREATED |
Well 03711766