QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2000-08-04 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 2251.000 |
True vertical depth | 2241.880 |
Tperf | 2003.000 |
Bperf | 2045.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Halliburton |
Tool | HIGH RES INDUCTION COMPENSATED DENSITY DUAL SPACED NEUTRON 2"=100' & 5"=100' |
Date | 2000-08-08 |
Run number | ONE |
Driller depth | 2251.000 |
Logger depth | 2254.000 |
Log bottom | 2245.000 |
Log top | 512.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | GEL/SP101 |
Mud density | 8.90 |
Mud visc (plastic) | 36.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 5.80 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | 21:03:00 |
Time since circulation | 18.000 |
Operating rig time | |
Notes |
36625 | 2018-03-28 11:47 | ashley | CLOSED, UNHANDED |
36625 | 2018-03-28 11:47 | ashley | EDITED RUN ONE (Aug. 8, 2000) |
36625 | 2018-03-28 11:44 | ashley | EDITED WELL METADATA |
36625 | 2018-03-28 11:38 | ashley | TAKEN |
36625 | 2018-03-20 11:59 | whdc | TASK CREATED |
33231 | 2018-03-13 15:07 | powen | CLOSED, UNHANDED |
33231 | 2018-03-13 15:07 | powen | EDITED RUN ONE (Aug. 8, 2000) |
33231 | 2018-03-13 15:06 | powen | EDITED RUN ONE (Aug. 8, 2000) |
33231 | 2018-03-13 15:05 | powen | ADDED RUN ONE (Aug. 8, 2000) |
33231 | 2018-03-13 15:00 | powen | EDITED WELL METADATA |
33231 | 2018-03-13 14:54 | powen | TAKEN |
33231 | 2018-02-20 07:39 | e.haugen | TASK CREATED |
Well 03724213