QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2010-08-17 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 415.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Welenco |
Tool | DUAL INDUCTION-GAMMA RAY LOG |
Date | 2010-09-13 |
Run number | One |
Driller depth | 409.000 |
Logger depth | 409.000 |
Log bottom | 406.000 |
Log top | 0.000 |
Casing size | 5.500 |
Bit size | |
Mud type | WATER |
Mud density | |
Mud visc (plastic) | |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | |
Notes |
37248 | 2018-04-10 10:11 | ashley | CLOSED, UNHANDED |
37248 | 2018-04-10 10:11 | ashley | EDITED RUN One (Sept. 13, 2010) |
37248 | 2018-04-10 10:08 | ashley | EDITED WELL METADATA |
37248 | 2018-04-10 10:07 | ashley | TAKEN |
37248 | 2018-03-28 14:30 | e.haugen | TASK CREATED |
34893 | 2018-03-21 19:15 | HLoss1 | CLOSED, UNHANDED |
34893 | 2018-03-21 19:15 | HLoss1 | ADDED RUN One (Sept. 13, 2010) |
34893 | 2018-03-21 19:13 | HLoss1 | EDITED WELL METADATA |
34893 | 2018-03-21 19:12 | HLoss1 | TAKEN |
34893 | 2018-03-19 14:39 | e.haugen | TASK CREATED |
Well 03041524