QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1966-02-08 |
Abandon date | 1997-08-29 |
Borehole orientation | Vertical |
Measured depth | 4225.000 |
True vertical depth | |
Tperf | 3188.000 |
Bperf | 3607.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | Induction-Electrical Log |
Date | 1966-02-12 |
Run number | 1 |
Driller depth | 4177.000 |
Logger depth | 4180.000 |
Log bottom | 4179.000 |
Log top | 100.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | FRESH NAT./GEL-HEXAGLASS |
Mud density | 72.00 |
Mud visc (plastic) | 48.00 |
Mud visc (funnel) | |
Mud ph | 8.50 |
Mud fluid loss | 5.20 |
Sample source | PIT |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 2.000 |
Operating rig time | |
Notes |
38192 | 2018-05-03 11:40 | ashley | CLOSED, UNHANDED |
38192 | 2018-05-03 11:40 | ashley | EDITED RUN 1 (Feb. 12, 1966) |
38192 | 2018-05-03 11:38 | ashley | EDITED WELL METADATA |
38192 | 2018-05-03 11:35 | ashley | TAKEN |
35837 | 2018-04-04 07:10 | sgainer | CLOSED, UNHANDED |
35837 | 2018-04-04 07:10 | sgainer | EDITED RUN 1 (Feb. 12, 1966) |
35837 | 2018-04-04 07:09 | sgainer | ADDED RUN 1 (Feb. 12, 1966) |
35837 | 2018-04-04 07:07 | sgainer | EDITED WELL METADATA |
35837 | 2018-04-04 07:03 | sgainer | TAKEN |
38192 | 2018-03-28 14:30 | e.haugen | TASK CREATED |
35837 | 2018-03-19 14:39 | e.haugen | TASK CREATED |
Well 02903147