LOG IN / HELP

<<< BACK TO JOB

San Ardo: 05300300

Enter:
(1) Well metadata for each well, if missing.
(2) Run metadata for each run.
(3) Log curve descriptions for each run.
(4) Temperature and resistivity observations for each run.

This task is closed and unheld.

See DOGGR well records.

Well construction

Name
Spud date 1965-07-06
Abandon date 1991-04-11
Borehole orientation Directional
Measured depth 2315.000
True vertical depth
Tperf 2210.000
Bperf 2314.000
Water geochem
No well data
Glog unavailable
Notes

Run headers

Service company SCHLUMBERGER
Tool INDUCTION ELECTRICAL LOG
Date 1965-07-09
Run number 1
Driller depth 2315.000
Logger depth 2315.000
Log bottom 2314.000
Log top 25.000
Casing size
Bit size 9.875
Mud type CLAY
Mud density 70.00
Mud visc (plastic) 45.00
Mud visc (funnel)
Mud ph 8.00
Mud fluid loss 8.40
Sample source PIT
Circulation stopped time
Logger on bottom time
Time since circulation 2.000
Operating rig time
Notes

G-log curves

1965-07-09 1
6FF40 INDUCTION CONDUCTIVITY
A-16"-M Short Normal
Induction
SPONTANEOUS POTENTIAL

Temperature and mud resistivity observations

1965-07-09 1
Rm = 2.700 Ωm @ 125.000 °F (2315.000 ft)
Rm = 4.600 Ωm @ 71.000 °F
Rmc = 2.200 Ωm @ 125.000 °F
Rmf = 2.400 Ωm @ 125.000 °F

Change log


43614 2018-07-18 11:15 ashley CLOSED, UNHANDED
43614 2018-07-18 11:15 ashley EDITED RUN 1 (July 9, 1965)
43614 2018-07-18 11:13 ashley EDITED WELL METADATA
43614 2018-07-18 11:05 ashley TAKEN
43614 2018-06-29 11:04 e.haugen TASK CREATED
41421 2018-06-20 11:32 ahowery CLOSED, UNHANDED
41421 2018-06-20 11:32 ahowery EDITED RUN 1 (July 9, 1965)
41421 2018-06-20 11:31 ahowery ADDED RUN 1 (July 9, 1965)
41421 2018-06-20 11:29 ahowery EDITED WELL METADATA
41421 2018-06-20 11:25 ahowery TAKEN
41421 2018-04-13 12:12 e.haugen TASK CREATED

Well versions and related tasks

Well 05300300