QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1975-10-23 |
Abandon date | 1981-08-20 |
Borehole orientation | |
Measured depth | 8053.000 |
True vertical depth | |
Tperf | 7410.000 |
Bperf | 8004.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger | Schlumberger | Schlumberger | Schlumberger | Schlumberger | Schlumberger |
Tool | Electrical Log | Electrical Log | Microlaterolog-Microlog | Simultaneous Compensated Neutron Formation Density | Microlaterolog-Microlog | Dual Induction SFL with linear correlation log |
Date | 1952-08-07 | 1952-08-28 | 1975-11-14 | 1975-11-17 | 1975-11-17 | 1981-07-26 |
Run number | ONE | TWO | ONE | ONE | TWO | ONE |
Driller depth | 6995.000 | 7914.000 | 7626.000 | 8053.000 | 8053.000 | 7810.000 |
Logger depth | 7000.000 | 7914.000 | 7631.000 | 8052.000 | 8055.000 | 7812.000 |
Log bottom | 7000.000 | 7914.000 | 7630.000 | 8052.000 | 8054.000 | 7806.000 |
Log top | 701.000 | 6995.000 | 4000.000 | 5196.000 | 6200.000 | 3958.000 |
Casing size | 10.750 | 10.750 | 10.750 | 7.000 | ||
Bit size | 9.875 | 9.875 | 9.875 | 6.500 | ||
Mud type | POLYMER | POLYMER | POLYMER | LIGNO | ||
Mud density | 69.50 | 69.00 | 69.00 | 70.00 | ||
Mud visc (plastic) | 43.00 | 43.00 | 43.00 | 43.00 | ||
Mud visc (funnel) | ||||||
Mud ph | 7.00 | 7.00 | 7.00 | 8.50 | ||
Mud fluid loss | 7.70 | 7.20 | 7.20 | |||
Sample source | PIT | CIRCULATED | CIRCULATED | FLOWLINE | ||
Circulation stopped time | 13:00:00 | 16:30:00 | ||||
Logger on bottom time | 00:30:00 | 20:00:00 | ||||
Time since circulation | 3.500 | 8.500 | ||||
Operating rig time | ||||||
Notes |
42768 | 2018-06-29 14:44 | francisco | CLOSED, UNHANDED |
42768 | 2018-06-29 14:44 | francisco | TAKEN |
42768 | 2018-05-03 11:21 | e.haugen | TASK CREATED |
42024 | 2018-04-30 07:43 | sgainer | CLOSED, UNHANDED |
42024 | 2018-04-30 07:42 | sgainer | ADDED RUN ONE (July 26, 1981) |
42024 | 2018-04-30 07:41 | sgainer | ADDED RUN TWO (Aug. 28, 1952) |
42024 | 2018-04-30 07:40 | sgainer | ADDED RUN ONE (Aug. 7, 1952) |
42024 | 2018-04-30 07:38 | sgainer | ADDED RUN TWO (Nov. 17, 1975) |
42024 | 2018-04-30 07:37 | sgainer | ADDED RUN ONE (Nov. 14, 1975) |
42024 | 2018-04-30 07:35 | sgainer | ADDED RUN ONE (Nov. 17, 1975) |
42024 | 2018-04-30 07:33 | sgainer | EDITED WELL METADATA |
42024 | 2018-04-30 07:30 | sgainer | EDITED WELL METADATA |
42024 | 2018-04-30 07:28 | sgainer | TAKEN |
42024 | 2018-04-17 11:00 | e.haugen | TASK CREATED |
Well 08320860