QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1975-08-19 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 4790.000 |
True vertical depth | |
Tperf | 4540.000 |
Bperf | 4770.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Go International |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1975-08-26 |
Run number | One |
Driller depth | 4339.000 |
Logger depth | |
Log bottom | |
Log top | |
Casing size | 13.750 |
Bit size | 12.750 |
Mud type | Gel-Water |
Mud density | 3.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | Circulated |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 0.000 |
Operating rig time | |
Notes | missing data due to unreadable log |
43071 | 2018-07-09 11:08 | dakota | CLOSED, UNHANDED |
43071 | 2018-07-09 11:07 | dakota | EDITED RUN One (Aug. 26, 1975) |
43071 | 2018-07-09 11:06 | dakota | EDITED WELL METADATA |
43071 | 2018-07-09 11:04 | dakota | TAKEN |
43071 | 2018-05-03 11:21 | e.haugen | TASK CREATED |
41777 | 2018-04-25 14:56 | fatimaburhan | CLOSED, UNHANDED |
41777 | 2018-04-25 14:56 | fatimaburhan | EDITED RUN One (Aug. 26, 1975) |
41777 | 2018-04-25 14:54 | fatimaburhan | ADDED RUN One (Aug. 26, 1975) |
41777 | 2018-04-25 14:50 | fatimaburhan | EDITED WELL METADATA |
41777 | 2018-04-25 14:45 | fatimaburhan | TAKEN |
41777 | 2018-04-17 11:00 | e.haugen | TASK CREATED |
Well 08320689