QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1969-01-22 |
Abandon date | 1992-02-26 |
Borehole orientation | Directional |
Measured depth | 2120.000 |
True vertical depth | |
Tperf | 1963.000 |
Bperf | 2120.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | INDUCTION-ELECTRICAL LOG |
Date | 1969-01-24 |
Run number | ONE |
Driller depth | 2120.000 |
Logger depth | 2125.000 |
Log bottom | 2124.000 |
Log top | 97.000 |
Casing size | 16.000 |
Bit size | 12.250 |
Mud type | FGM-C |
Mud density | 70.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | 8.80 |
Mud fluid loss | 9.60 |
Sample source | PIT |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 2.000 |
Operating rig time | |
Notes |
44114 | 2018-07-24 13:16 | ashley | CLOSED, UNHANDED |
44114 | 2018-07-24 13:16 | ashley | EDITED RUN ONE (Jan. 24, 1969) |
44114 | 2018-07-24 13:14 | ashley | EDITED WELL METADATA |
44114 | 2018-07-24 13:09 | ashley | TAKEN |
44114 | 2018-06-29 11:04 | e.haugen | TASK CREATED |
40730 | 2018-06-13 10:37 | hannaho | CLOSED, UNHANDED |
40730 | 2018-06-13 10:37 | hannaho | EDITED RUN ONE (Jan. 24, 1969) |
40730 | 2018-06-13 10:35 | hannaho | ADDED RUN ONE (Jan. 24, 1969) |
40730 | 2018-06-13 10:33 | hannaho | EDITED WELL METADATA |
40730 | 2018-06-13 10:24 | hannaho | EDITED WELL METADATA |
40730 | 2018-06-13 10:17 | hannaho | TAKEN |
40730 | 2018-04-13 12:12 | e.haugen | TASK CREATED |
Well 05320141