QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1951-08-03 |
Abandon date | 2015-02-02 |
Borehole orientation | Vertical |
Measured depth | 2306.000 |
True vertical depth | |
Tperf | 2121.000 |
Bperf | 2305.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER | GO WESTERN |
Tool | ELECTRICAL LOG | INDUCTION ELECTRIC LOG |
Date | 1951-08-07 | 1966-06-01 |
Run number | 1 | 1 |
Driller depth | 2225.000 | 2272.000 |
Logger depth | 2224.000 | 2267.000 |
Log bottom | 2223.000 | 2266.000 |
Log top | 85.000 | 2182.000 |
Casing size | 8.625 | |
Bit size | 11.000 | 7.625 |
Mud type | Jel | LO-LOSS |
Mud density | 77.00 | |
Mud visc (plastic) | 44.00 | |
Mud visc (funnel) | ||
Mud ph | ||
Mud fluid loss | ||
Sample source | PIT | |
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | ||
Operating rig time | 2.000 | |
Notes |
44556 | 2018-07-30 10:51 | ashley | CLOSED, UNHANDED |
44556 | 2018-07-30 10:51 | ashley | EDITED RUN 1 (June 1, 1966) |
44556 | 2018-07-30 10:49 | ashley | EDITED RUN 1 (Aug. 7, 1951) |
44556 | 2018-07-30 10:46 | ashley | EDITED WELL METADATA |
44556 | 2018-07-30 10:39 | ashley | TAKEN |
44556 | 2018-06-29 11:04 | e.haugen | TASK CREATED |
40513 | 2018-06-07 14:07 | Jbunch | CLOSED, UNHANDED |
40513 | 2018-06-07 14:07 | Jbunch | ADDED RUN 1 (June 1, 1966) |
40513 | 2018-06-07 14:05 | Jbunch | ADDED RUN 1 (Aug. 7, 1951) |
40513 | 2018-06-07 14:03 | Jbunch | EDITED WELL METADATA |
40513 | 2018-06-07 14:01 | Jbunch | TAKEN |
40513 | 2018-04-13 12:12 | e.haugen | TASK CREATED |
Well 05300667