QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1972-06-26 |
Abandon date | 1978-01-27 |
Borehole orientation | Vertical |
Measured depth | 2285.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATION |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1972-06-29 |
Run number | ONE |
Driller depth | 2235.000 |
Logger depth | 2229.000 |
Log bottom | 2228.000 |
Log top | 2127.000 |
Casing size | 8.625 |
Bit size | 7.625 |
Mud type | STARCH BASE MY'LO GEL |
Mud density | 67.00 |
Mud visc (plastic) | 40.00 |
Mud visc (funnel) | |
Mud ph | 7.50 |
Mud fluid loss | 15.30 |
Sample source | CIRC. |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 0.000 |
Operating rig time | |
Notes |
44616 | 2018-07-31 11:20 | ashley | CLOSED, UNHANDED |
44616 | 2018-07-31 11:20 | ashley | EDITED RUN ONE (June 29, 1972) |
44616 | 2018-07-31 11:18 | ashley | EDITED WELL METADATA |
44616 | 2018-07-31 11:14 | ashley | TAKEN |
44616 | 2018-06-29 11:04 | e.haugen | TASK CREATED |
40458 | 2018-06-07 11:17 | Jbunch | CLOSED, UNHANDED |
40458 | 2018-06-07 11:17 | Jbunch | EDITED RUN ONE (June 29, 1972) |
40458 | 2018-06-07 11:16 | Jbunch | ADDED RUN ONE (June 29, 1972) |
40458 | 2018-06-07 11:14 | Jbunch | EDITED WELL METADATA |
40458 | 2018-06-07 11:12 | Jbunch | TAKEN |
40458 | 2018-04-13 12:12 | e.haugen | TASK CREATED |
Well 05320395