QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1996-05-01 |
Abandon date | 1996-05-04 |
Borehole orientation | Vertical |
Measured depth | 2606.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Never produced |
Service company | Halliburton |
Tool | Dual Induction Compensated Density Dual Spaced Neutron |
Date | 1996-05-03 |
Run number | ONE |
Driller depth | 2606.000 |
Logger depth | 2591.000 |
Log bottom | 2589.000 |
Log top | 50.000 |
Casing size | 10.000 |
Bit size | 7.875 |
Mud type | GEL/PAC |
Mud density | 10.00 |
Mud visc (plastic) | 60.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | 11:30:00 |
Time since circulation | 10.000 |
Operating rig time | |
Notes |
46058 | 2018-08-20 12:23 | ashley | CLOSED, UNHANDED |
46058 | 2018-08-20 12:23 | ashley | EDITED RUN ONE (May 3, 1996) |
46058 | 2018-08-20 12:19 | ashley | EDITED WELL METADATA |
46058 | 2018-08-20 12:16 | ashley | TAKEN |
46058 | 2018-06-29 11:04 | e.haugen | TASK CREATED |
38880 | 2018-05-07 07:48 | sgainer | CLOSED, UNHANDED |
38880 | 2018-05-07 07:48 | sgainer | ADDED RUN ONE (May 3, 1996) |
38880 | 2018-05-07 07:45 | sgainer | EDITED WELL METADATA |
38880 | 2018-05-07 07:40 | sgainer | TAKEN |
38880 | 2018-04-13 12:12 | e.haugen | TASK CREATED |
Well 05321520