QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1981-04-03 |
Abandon date | 1981-04-09 |
Borehole orientation | Vertical |
Measured depth | 1619.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Never produced |
Service company | Gearhart | Gearhart |
Tool | COMPENSATED DENSITY COMPENSATED NEUTRON LOG | DUAL INDUCTION LATEROLOG |
Date | 1981-04-08 | 1981-04-08 |
Run number | One | ONE |
Driller depth | 1619.000 | 1619.000 |
Logger depth | 1617.000 | 1617.000 |
Log bottom | 1616.000 | 1616.000 |
Log top | 30.000 | 30.000 |
Casing size | 11.750 | |
Bit size | 9.875 | 9.875 |
Mud type | GEL/CYPAN | GEL-CYPAN |
Mud density | 67.00 | 67.00 |
Mud visc (plastic) | 48.00 | 48.00 |
Mud visc (funnel) | ||
Mud ph | 7.60 | 7.60 |
Mud fluid loss | 5.40 | 5.40 |
Sample source | FLOWLINE | FLOWLINE |
Circulation stopped time | 23:00:00 | 23:00:00 |
Logger on bottom time | 23:40:00 | 23:40:00 |
Time since circulation | ||
Operating rig time | ||
Notes |
51510 | 2018-08-27 15:30 | ashley | CLOSED, UNHANDED |
51510 | 2018-08-27 15:30 | ashley | EDITED RUN One (April 8, 1981) |
51510 | 2018-08-27 15:27 | ashley | EDITED RUN ONE (April 8, 1981) |
51510 | 2018-08-27 15:26 | ashley | ADDED RUN ONE (April 8, 1981) |
51510 | 2018-08-27 15:23 | ashley | EDITED WELL METADATA |
51510 | 2018-08-27 15:19 | ashley | TAKEN |
51510 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
12903 | 2018-01-11 12:31 | fatimaburhan | CLOSED, UNHANDED |
12903 | 2018-01-11 12:31 | fatimaburhan | ADDED RUN One (April 8, 1981) |
12903 | 2018-01-11 12:28 | fatimaburhan | TAKEN |
12903 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 07920167