QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1998-09-26 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 2001.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | OB Well |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP DENSITY/NEUTRON/GR/ML |
Date | 1998-09-28 |
Run number | 1 |
Driller depth | 2001.000 |
Logger depth | 2002.000 |
Log bottom | 1994.000 |
Log top | 47.000 |
Casing size | 10.750 |
Bit size | 6.500 |
Mud type | GEL/PAC |
Mud density | 9.20 |
Mud visc (plastic) | 44.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 10.60 |
Sample source | FLOWLINE |
Circulation stopped time | 08:00:00 |
Logger on bottom time | 11:15:00 |
Time since circulation | |
Operating rig time | |
Notes |
51671 | 2018-08-31 10:48 | dakota | CLOSED, UNHANDED |
51671 | 2018-08-31 10:48 | dakota | EDITED RUN 1 (Sept. 28, 1998) |
51671 | 2018-08-31 10:46 | dakota | EDITED WELL METADATA |
51671 | 2018-08-31 10:46 | dakota | EDITED WELL METADATA |
51671 | 2018-08-31 10:45 | dakota | TAKEN |
51671 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
14680 | 2018-02-07 12:29 | powen | CLOSED, UNHANDED |
14680 | 2018-02-07 12:29 | powen | EDITED RUN 1 (Sept. 28, 1998) |
14680 | 2018-02-07 12:28 | powen | EDITED RUN 1 (Sept. 28, 1998) |
14680 | 2018-02-07 12:27 | powen | ADDED RUN 1 (Sept. 28, 1998) |
14680 | 2018-02-07 12:23 | powen | EDITED WELL METADATA |
14680 | 2018-02-07 12:21 | powen | TAKEN |
14680 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03012384