QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1998-09-21 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1279.000 |
True vertical depth | 1271.280 |
Tperf | 949.000 |
Bperf | 1279.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP NEUTRON/DENSITY/GR/ML |
Date | 1998-09-23 |
Run number | 1 |
Driller depth | 1279.000 |
Logger depth | 1280.000 |
Log bottom | 1272.000 |
Log top | 51.750 |
Casing size | 13.325 |
Bit size | 8.750 |
Mud type | GEL/PAC |
Mud density | 8.90 |
Mud visc (plastic) | |
Mud visc (funnel) | 38.00 |
Mud ph | 8.00 |
Mud fluid loss | 13.80 |
Sample source | FLOWLINE |
Circulation stopped time | 02:00:00 |
Logger on bottom time | 05:45:00 |
Time since circulation | |
Operating rig time | |
Notes |
51739 | 2018-08-31 16:47 | ashley | CLOSED, UNHANDED |
51739 | 2018-08-31 16:47 | ashley | EDITED RUN 1 (Sept. 23, 1998) |
51739 | 2018-08-31 16:47 | ashley | EDITED RUN 1 (Sept. 23, 1998) |
51739 | 2018-08-31 16:40 | ashley | EDITED WELL METADATA |
51739 | 2018-08-31 16:38 | ashley | TAKEN |
51739 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
14363 | 2018-02-01 15:09 | powen | CLOSED, UNHANDED |
14363 | 2018-02-01 15:09 | powen | EDITED RUN 1 (Sept. 23, 1998) |
14363 | 2018-02-01 15:08 | powen | EDITED RUN 1 (Sept. 23, 1998) |
14363 | 2018-02-01 15:07 | powen | EDITED RUN 1 (Sept. 23, 1998) |
14363 | 2018-02-01 15:05 | powen | ADDED RUN 1 (Sept. 23, 1998) |
14363 | 2018-02-01 15:00 | powen | EDITED WELL METADATA |
14363 | 2018-02-01 14:57 | powen | TAKEN |
14363 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03011477