QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1985-02-06 |
Abandon date | 2006-02-16 |
Borehole orientation | Directional |
Measured depth | 1304.000 |
True vertical depth | 1299.430 |
Tperf | 1105.000 |
Bperf | 1200.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | Never produced |
Service company | Gearhart |
Tool | DUAL LATEROLOG |
Date | 1985-02-09 |
Run number | ONE |
Driller depth | 1304.000 |
Logger depth | 1300.000 |
Log bottom | 1298.000 |
Log top | 30.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | SALT MUD |
Mud density | 8.80 |
Mud visc (plastic) | 40.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 0.30 |
Sample source | FLOWLINE |
Circulation stopped time | 08:15:00 |
Logger on bottom time | 10:06:00 |
Time since circulation | |
Operating rig time | |
Notes | Fluid loss is in cc |
51935 | 2018-09-06 09:45 | ashley | CLOSED, UNHANDED |
51935 | 2018-09-06 09:45 | ashley | EDITED RUN ONE (Feb. 9, 1985) |
51935 | 2018-09-06 09:41 | ashley | EDITED WELL METADATA |
51935 | 2018-09-06 09:38 | ashley | TAKEN |
51935 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
12899 | 2018-01-11 12:21 | fatimaburhan | CLOSED, UNHANDED |
12899 | 2018-01-11 12:21 | fatimaburhan | EDITED RUN ONE (Feb. 9, 1985) |
12899 | 2018-01-11 12:20 | fatimaburhan | ADDED RUN ONE (Feb. 9, 1985) |
12899 | 2018-01-11 12:18 | fatimaburhan | TAKEN |
12899 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02974237