QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1999-04-16 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1770.000 |
True vertical depth | 1688.890 |
Tperf | 1387.000 |
Bperf | 1770.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | FULL PLATFORM EXPRESS ARRAY INDUCTION/SP/ML DENSITY/NEUTRON/GR |
Date | 1999-04-18 |
Run number | 1 |
Driller depth | 1770.000 |
Logger depth | 1770.000 |
Log bottom | 1762.000 |
Log top | 52.000 |
Casing size | 12.750 |
Bit size | 9.875 |
Mud type | GEL/PAC |
Mud density | 9.00 |
Mud visc (plastic) | |
Mud visc (funnel) | 35.00 |
Mud ph | |
Mud fluid loss | |
Sample source | FLOWLINE |
Circulation stopped time | 01:00:00 |
Logger on bottom time | 03:50:00 |
Time since circulation | |
Operating rig time | |
Notes |
51936 | 2018-09-05 13:54 | ashley | CLOSED, UNHANDED |
51936 | 2018-09-05 13:53 | ashley | EDITED RUN 1 (April 18, 1999) |
51936 | 2018-09-05 13:50 | ashley | EDITED WELL METADATA |
51936 | 2018-09-05 13:47 | ashley | TAKEN |
51936 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
12966 | 2018-01-11 14:19 | powen | CLOSED, UNHANDED |
12966 | 2018-01-11 14:19 | powen | EDITED RUN 1 (April 18, 1999) |
12966 | 2018-01-11 14:19 | powen | EDITED RUN 1 (April 18, 1999) |
12966 | 2018-01-11 14:18 | powen | ADDED RUN 1 (April 18, 1999) |
12966 | 2018-01-11 14:15 | powen | EDITED WELL METADATA |
12966 | 2018-01-11 14:11 | powen | TAKEN |
12966 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03012966