QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1989-07-09 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1285.000 |
True vertical depth | |
Tperf | 488.000 |
Bperf | 1285.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger | SCHLUMBERGER |
Tool | DUAL LATEROLOG/MSFL/GR | DUAL LATEROLOG-MICRO SFL COMPENSATED NEUTRON LITHO DENSITY LOG |
Date | 1989-07-10 | 1993-07-12 |
Run number | ONE | ONE |
Driller depth | 1250.000 | 1380.000 |
Logger depth | 1250.000 | 1366.000 |
Log bottom | 1248.000 | 1365.000 |
Log top | 52.000 | 488.000 |
Casing size | 10.750 | |
Bit size | 7.875 | 7.000 |
Mud type | DRISPAC/GEL | GEL |
Mud density | 66.00 | 9.30 |
Mud visc (plastic) | ||
Mud visc (funnel) | 45.00 | 57.00 |
Mud ph | 7.80 | |
Mud fluid loss | 5.40 | |
Sample source | CIRCULATED | |
Circulation stopped time | 14:30:00 | 17:45:00 |
Logger on bottom time | 16:41:00 | 19:45:00 |
Time since circulation | ||
Operating rig time | ||
Notes | rmf & rmc obstructed |
52576 | 2018-09-18 17:52 | dakota | CLOSED, UNHANDED |
52576 | 2018-09-18 17:50 | dakota | EDITED RUN ONE (July 12, 1993) |
52576 | 2018-09-18 17:49 | dakota | EDITED RUN ONE (July 10, 1989) |
52576 | 2018-09-18 17:48 | dakota | ADDED RUN ONE (July 10, 1989) |
52576 | 2018-09-18 17:45 | dakota | EDITED WELL METADATA |
52576 | 2018-09-18 17:43 | dakota | TAKEN |
52576 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
14239 | 2018-01-31 12:26 | ellie | CLOSED, UNHANDED |
14239 | 2018-01-31 12:25 | ellie | EDITED RUN ONE (July 12, 1993) |
14239 | 2018-01-31 12:25 | ellie | ADDED RUN ONE (July 12, 1993) |
14239 | 2018-01-31 12:14 | ellie | EDITED WELL METADATA |
14239 | 2018-01-31 12:12 | ellie | TAKEN |
14239 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02984419