QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1995-02-18 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1787.000 |
True vertical depth | |
Tperf | 1532.000 |
Bperf | 1787.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | DUAL INDUCTION-SFL LITHO DENSITY-GR COMPENSATED NEUTRON |
Date | 1995-02-19 |
Run number | ONE |
Driller depth | 1785.000 |
Logger depth | 1784.000 |
Log bottom | 1778.000 |
Log top | 54.000 |
Casing size | 13.375 |
Bit size | 12.250 |
Mud type | GEL/CYPAN |
Mud density | 8.90 |
Mud visc (plastic) | |
Mud visc (funnel) | 46.00 |
Mud ph | 7.50 |
Mud fluid loss | 5.40 |
Sample source | FLOWLINE |
Circulation stopped time | 20:15:00 |
Logger on bottom time | 21:45:00 |
Time since circulation | |
Operating rig time | |
Notes |
52677 | 2018-09-20 16:11 | dakota | CLOSED, UNHANDED |
52677 | 2018-09-20 16:11 | dakota | EDITED RUN ONE (Feb. 19, 1995) |
52677 | 2018-09-20 16:10 | dakota | EDITED WELL METADATA |
52677 | 2018-09-20 16:08 | dakota | TAKEN |
52677 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
14075 | 2018-01-29 19:14 | hannaho | CLOSED, UNHANDED |
14075 | 2018-01-29 19:14 | hannaho | EDITED RUN ONE (Feb. 19, 1995) |
14075 | 2018-01-29 19:14 | hannaho | EDITED RUN ONE (Feb. 19, 1995) |
14075 | 2018-01-29 19:10 | hannaho | ADDED RUN ONE (Feb. 19, 1995) |
14075 | 2018-01-29 19:05 | hannaho | EDITED WELL METADATA |
14075 | 2018-01-29 18:59 | hannaho | TAKEN |
14075 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03002281