QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1995-11-05 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1892.000 |
True vertical depth | |
Tperf | 1567.000 |
Bperf | 1778.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP DENSITY/NEUTRON/GR |
Date | 1995-11-06 |
Run number | 1 |
Driller depth | 1785.000 |
Logger depth | 1788.000 |
Log bottom | 1780.000 |
Log top | 50.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | gel/aquapac |
Mud density | 8.80 |
Mud visc (plastic) | |
Mud visc (funnel) | 41.00 |
Mud ph | 8.00 |
Mud fluid loss | 7.70 |
Sample source | FLOWLINE |
Circulation stopped time | 19:00:00 |
Logger on bottom time | 22:30:00 |
Time since circulation | |
Operating rig time | |
Notes |
52770 | 2018-09-22 14:22 | dakota | CLOSED, UNHANDED |
52770 | 2018-09-22 14:22 | dakota | EDITED RUN 1 (Nov. 6, 1995) |
52770 | 2018-09-22 14:19 | dakota | EDITED WELL METADATA |
52770 | 2018-09-22 14:14 | dakota | TAKEN |
52770 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
14150 | 2018-01-30 13:43 | powen | CLOSED, UNHANDED |
14150 | 2018-01-30 13:40 | powen | EDITED RUN 1 (Nov. 6, 1995) |
14150 | 2018-01-30 13:40 | powen | EDITED RUN 1 (Nov. 6, 1995) |
14150 | 2018-01-30 13:39 | powen | ADDED RUN 1 (Nov. 6, 1995) |
14150 | 2018-01-30 13:36 | powen | EDITED WELL METADATA |
14150 | 2018-01-30 13:31 | powen | TAKEN |
14150 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03004462