QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1997-08-04 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1568.000 |
True vertical depth | |
Tperf | 1220.000 |
Bperf | 1410.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP/ML DENISTY/NEUTRON/GR/TEMP |
Date | 1997-08-05 |
Run number | 1 |
Driller depth | 1376.000 |
Logger depth | 1370.000 |
Log bottom | 1362.000 |
Log top | 52.000 |
Casing size | 10.750 |
Bit size | 8.750 |
Mud type | GEL/DRILLPAC |
Mud density | 9.10 |
Mud visc (plastic) | |
Mud visc (funnel) | 40.00 |
Mud ph | 8.00 |
Mud fluid loss | 7.30 |
Sample source | FLOWLINE |
Circulation stopped time | 10:00:00 |
Logger on bottom time | 11:45:00 |
Time since circulation | |
Operating rig time | |
Notes |
52774 | 2018-09-22 11:51 | dakota | CLOSED, UNHANDED |
52774 | 2018-09-22 11:51 | dakota | EDITED RUN 1 (Aug. 5, 1997) |
52774 | 2018-09-22 11:48 | dakota | EDITED WELL METADATA |
52774 | 2018-09-22 11:47 | dakota | TAKEN |
52774 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
14160 | 2018-01-30 14:55 | powen | CLOSED, UNHANDED |
14160 | 2018-01-30 14:55 | powen | EDITED RUN 1 (Aug. 5, 1997) |
14160 | 2018-01-30 14:53 | powen | EDITED RUN 1 (Aug. 5, 1997) |
14160 | 2018-01-30 14:51 | powen | ADDED RUN 1 (Aug. 5, 1997) |
14160 | 2018-01-30 14:49 | powen | EDITED WELL METADATA |
14160 | 2018-01-30 14:46 | powen | TAKEN |
14160 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03008321