QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1998-07-15 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1140.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP/ML DENSITY/NEUTRON/GR/EMS |
Date | 1998-07-16 |
Run number | 1 |
Driller depth | 1140.000 |
Logger depth | 1140.000 |
Log bottom | 1132.000 |
Log top | 50.000 |
Casing size | 10.750 |
Bit size | 6.500 |
Mud type | GEL/POLYMER |
Mud density | 9.10 |
Mud visc (plastic) | |
Mud visc (funnel) | 41.00 |
Mud ph | |
Mud fluid loss | |
Sample source | FLOWLINE |
Circulation stopped time | 15:30:00 |
Logger on bottom time | 18:00:00 |
Time since circulation | |
Operating rig time | |
Notes |
52887 | 2018-10-01 13:48 | ashley | CLOSED, UNHANDED |
52887 | 2018-10-01 13:48 | ashley | EDITED RUN 1 (July 16, 1998) |
52887 | 2018-10-01 13:43 | ashley | EDITED WELL METADATA |
52887 | 2018-10-01 13:41 | ashley | TAKEN |
52887 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
14964 | 2018-02-13 16:08 | powen | CLOSED, UNHANDED |
14964 | 2018-02-13 16:08 | powen | EDITED RUN 1 (July 16, 1998) |
14964 | 2018-02-13 16:06 | powen | EDITED RUN 1 (July 16, 1998) |
14964 | 2018-02-13 16:05 | powen | EDITED RUN 1 (July 16, 1998) |
14964 | 2018-02-08 17:00 | powen | EDITED RUN 1 (July 16, 1998) |
14964 | 2018-02-08 16:59 | powen | ADDED RUN 1 (July 16, 1998) |
14964 | 2018-02-08 16:54 | powen | EDITED WELL METADATA |
14964 | 2018-02-08 16:51 | powen | TAKEN |
14964 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03011794