QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1996-11-03 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1900.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Halliburton |
Tool | HIGH RESOLUTION INDUCTION |
Date | 1996-11-05 |
Run number | ONE |
Driller depth | 1900.000 |
Logger depth | 1898.000 |
Log bottom | 1889.000 |
Log top | 93.000 |
Casing size | 8.625 |
Bit size | 7.875 |
Mud type | GEL |
Mud density | 8.70 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | 03:00:00 |
Time since circulation | 2.500 |
Operating rig time | |
Notes |
52956 | 2018-10-02 16:56 | ashley | CLOSED, UNHANDED |
52956 | 2018-10-02 16:56 | ashley | EDITED RUN ONE (Nov. 5, 1996) |
52956 | 2018-10-02 16:52 | ashley | EDITED WELL METADATA |
52956 | 2018-10-02 16:43 | ashley | TAKEN |
52956 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
14982 | 2018-02-13 11:12 | fatimaburhan | CLOSED, UNHANDED |
14982 | 2018-02-13 11:12 | fatimaburhan | EDITED RUN ONE (Nov. 5, 1996) |
14982 | 2018-02-13 11:10 | fatimaburhan | ADDED RUN ONE (Nov. 5, 1996) |
14982 | 2018-02-13 11:00 | fatimaburhan | TAKEN |
14982 | 2018-02-02 14:39 | HLoss1 | UNHANDED |
14982 | 2018-02-02 14:38 | HLoss1 | TAKEN |
14982 | 2018-02-02 14:38 | HLoss1 | TAKEN |
14982 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03006752