QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1997-09-27 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1126.000 |
True vertical depth | 1121.000 |
Tperf | 594.000 |
Bperf | 976.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP DENSITY/NEUTRON/GR |
Date | 1997-09-30 |
Run number | 1 |
Driller depth | 1126.000 |
Logger depth | 1128.000 |
Log bottom | 1120.000 |
Log top | 60.000 |
Casing size | 10.750 |
Bit size | 8.750 |
Mud type | GEL/PAC |
Mud density | 9.20 |
Mud visc (plastic) | |
Mud visc (funnel) | 42.00 |
Mud ph | 7.00 |
Mud fluid loss | 9.40 |
Sample source | FLOWLINE |
Circulation stopped time | 04:00:00 |
Logger on bottom time | 08:26:00 |
Time since circulation | |
Operating rig time | |
Notes |
53050 | 2018-10-18 16:40 | dakota | CLOSED, UNHANDED |
53050 | 2018-10-18 16:40 | dakota | EDITED RUN 1 (Sept. 30, 1997) |
53050 | 2018-10-18 16:38 | dakota | EDITED WELL METADATA |
53050 | 2018-10-18 16:36 | dakota | TAKEN |
53050 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
14891 | 2018-02-08 14:38 | powen | CLOSED, UNHANDED |
14891 | 2018-02-08 14:38 | powen | EDITED RUN 1 (Sept. 30, 1997) |
14891 | 2018-02-08 14:38 | powen | EDITED RUN 1 (Sept. 30, 1997) |
14891 | 2018-02-08 14:33 | powen | ADDED RUN 1 (Sept. 30, 1997) |
14891 | 2018-02-08 14:29 | powen | EDITED WELL METADATA |
14891 | 2018-02-08 14:27 | powen | TAKEN |
14891 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03008998