QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1987-04-24 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1230.000 |
True vertical depth | |
Tperf | 470.000 |
Bperf | 1192.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GEARHART | Schlumberger |
Tool | DUAL INDUCTION LATEROLOG | DUAL LATEROLOG - MSFL LITHO DENSITY COMPENSATED NEUTRON |
Date | 1987-04-25 | 1993-07-05 |
Run number | ONE | 1 |
Driller depth | 1230.000 | 1350.000 |
Logger depth | 1229.000 | 1350.000 |
Log bottom | 1227.000 | 1335.000 |
Log top | 49.000 | 470.000 |
Casing size | 10.750 | 7.000 |
Bit size | 9.875 | 6.250 |
Mud type | DRISPAC | GEL |
Mud density | 66.00 | 8.80 |
Mud visc (plastic) | 44.00 | |
Mud visc (funnel) | 45.00 | |
Mud ph | 8.00 | 9.00 |
Mud fluid loss | 5.70 | 12.00 |
Sample source | PIT | FLOWLINE |
Circulation stopped time | 01:00:00 | 00:30:00 |
Logger on bottom time | 02:00:00 | 01:30:00 |
Time since circulation | ||
Operating rig time | ||
Notes |
53183 | 2018-10-09 11:37 | ashley | CLOSED, UNHANDED |
53183 | 2018-10-09 11:36 | ashley | EDITED RUN 1 (July 5, 1993) |
53183 | 2018-10-09 11:32 | ashley | EDITED RUN ONE (April 25, 1987) |
53183 | 2018-10-09 11:30 | ashley | ADDED RUN ONE (April 25, 1987) |
53183 | 2018-10-09 11:26 | ashley | EDITED WELL METADATA |
53183 | 2018-10-09 11:23 | ashley | TAKEN |
53183 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
15668 | 2018-02-22 13:03 | fatimaburhan | CLOSED, UNHANDED |
15668 | 2018-02-22 13:03 | fatimaburhan | EDITED RUN 1 (July 5, 1993) |
15668 | 2018-02-22 13:01 | fatimaburhan | ADDED RUN 1 (July 5, 1993) |
15668 | 2018-02-22 12:59 | fatimaburhan | EDITED WELL METADATA |
15668 | 2018-02-22 12:57 | fatimaburhan | TAKEN |
15668 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02979875