QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1998-08-14 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1928.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | NO PERF RECORDS |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP DENSITY/NEUTRON/GR/ML |
Date | 1998-08-16 |
Run number | 1 |
Driller depth | 1931.000 |
Logger depth | 1931.000 |
Log bottom | 1923.000 |
Log top | 49.000 |
Casing size | 10.750 |
Bit size | 6.500 |
Mud type | GEL/PAC |
Mud density | 9.10 |
Mud visc (plastic) | |
Mud visc (funnel) | 40.00 |
Mud ph | 7.80 |
Mud fluid loss | 8.40 |
Sample source | FLOWLINE |
Circulation stopped time | 11:30:00 |
Logger on bottom time | 14:45:00 |
Time since circulation | |
Operating rig time | |
Notes |
53407 | 2018-10-12 14:42 | diana | CLOSED, UNHANDED |
53407 | 2018-10-12 14:42 | diana | EDITED RUN 1 (Aug. 16, 1998) |
53407 | 2018-10-12 14:40 | diana | EDITED RUN 1 (Aug. 16, 1998) |
53407 | 2018-10-12 14:38 | diana | EDITED WELL METADATA |
53407 | 2018-10-12 14:36 | diana | TAKEN |
53407 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
15596 | 2018-02-21 12:43 | powen | CLOSED, UNHANDED |
15596 | 2018-02-21 12:42 | powen | EDITED RUN 1 (Aug. 16, 1998) |
15596 | 2018-02-21 12:42 | powen | EDITED RUN 1 (Aug. 16, 1998) |
15596 | 2018-02-21 12:38 | powen | ADDED RUN 1 (Aug. 16, 1998) |
15596 | 2018-02-21 12:35 | powen | EDITED WELL METADATA |
15596 | 2018-02-21 12:29 | powen | TAKEN |
15596 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03012232