QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1976-10-28 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1260.000 |
True vertical depth | |
Tperf | 825.000 |
Bperf | 1180.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL | SCHLUMBERGER |
Tool | INDUCTION ELECTRICAL LOG | DUAL INDUCTION - SFL LITHODENSITY, TEMP. COMPENSATED NEUTRON |
Date | 1976-10-29 | 1994-03-15 |
Run number | One | 1 |
Driller depth | 1085.000 | 1260.000 |
Logger depth | 1086.000 | 1258.000 |
Log bottom | 1085.000 | 1252.000 |
Log top | 35.000 | 825.000 |
Casing size | 10.750 | 7.000 |
Bit size | 9.875 | 6.250 |
Mud type | CHEM. -GEL | GEL-DRISPAC |
Mud density | 68.00 | 8.80 |
Mud visc (plastic) | 45.00 | |
Mud visc (funnel) | 49.00 | |
Mud ph | 8.00 | |
Mud fluid loss | 5.00 | |
Sample source | FLOWLINE | FLOWLINE |
Circulation stopped time | 23:30:00 | |
Logger on bottom time | 02:00:00 | |
Time since circulation | 0.500 | |
Operating rig time | ||
Notes | Fluid loss is in cc |
53796 | 2018-10-19 14:41 | ashley | CLOSED, UNHANDED |
53796 | 2018-10-19 14:41 | ashley | EDITED RUN 1 (March 15, 1994) |
53796 | 2018-10-19 14:37 | ashley | EDITED RUN One (Oct. 29, 1976) |
53796 | 2018-10-19 14:35 | ashley | EDITED WELL METADATA |
53796 | 2018-10-19 14:32 | ashley | TAKEN |
53796 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
16187 | 2018-04-13 11:48 | diana | CLOSED, UNHANDED |
16187 | 2018-04-13 11:48 | diana | ADDED RUN 1 (March 15, 1994) |
16187 | 2018-04-13 11:37 | diana | EDITED RUN One (Oct. 29, 1976) |
16187 | 2018-04-13 11:37 | diana | ADDED RUN One (Oct. 29, 1976) |
16187 | 2018-04-13 11:32 | diana | EDITED WELL METADATA |
16187 | 2018-04-13 11:29 | diana | TAKEN |
16187 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02954018