QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1976-06-25 |
Abandon date | 2000-07-28 |
Borehole orientation | Vertical |
Measured depth | 1746.000 |
True vertical depth | |
Tperf | 1417.000 |
Bperf | 1714.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | DUAL INDUCTION - LATEROLOG WITH LINEAR CORRELATION LOG |
Date | 1976-07-27 |
Run number | ONE |
Driller depth | 1746.000 |
Logger depth | 1746.000 |
Log bottom | 1740.000 |
Log top | 46.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | FGM |
Mud density | 68.00 |
Mud visc (plastic) | 47.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 8.40 |
Sample source | CIRC. |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.000 |
Operating rig time | |
Notes |
54033 | 2018-10-23 14:15 | ashley | CLOSED, UNHANDED |
54033 | 2018-10-23 14:15 | ashley | EDITED RUN ONE (July 27, 1976) |
54033 | 2018-10-23 14:14 | ashley | EDITED WELL METADATA |
54033 | 2018-10-23 14:12 | ashley | TAKEN |
54033 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
16646 | 2018-06-26 17:11 | robin | CLOSED, UNHANDED |
16646 | 2018-06-26 17:10 | robin | EDITED RUN ONE (July 27, 1976) |
16646 | 2018-06-26 17:07 | robin | ADDED RUN ONE (July 27, 1976) |
16646 | 2018-06-26 17:04 | robin | EDITED WELL METADATA |
16646 | 2018-06-26 17:00 | robin | TAKEN |
16646 | 2018-04-13 15:07 | HLoss1 | UNHANDED |
16646 | 2018-04-13 15:06 | HLoss1 | TAKEN |
16646 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02953541