QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1971-04-26 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1200.000 |
True vertical depth | |
Tperf | 738.000 |
Bperf | 1198.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1971-04-27 |
Run number | ONE |
Driller depth | 1200.000 |
Logger depth | 1197.000 |
Log bottom | 1196.000 |
Log top | 29.000 |
Casing size | 11.750 |
Bit size | 10.625 |
Mud type | CLAY BASE |
Mud density | 70.00 |
Mud visc (plastic) | 48.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | PIT |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 0.500 |
Operating rig time | |
Notes |
54158 | 2018-10-24 14:21 | ashley | CLOSED, UNHANDED |
54158 | 2018-10-24 14:21 | ashley | EDITED RUN ONE (April 27, 1971) |
54158 | 2018-10-24 14:19 | ashley | EDITED WELL METADATA |
54158 | 2018-10-24 14:18 | ashley | TAKEN |
54158 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
20505 | 2018-07-06 11:25 | evanschmidt013 | CLOSED, UNHANDED |
20505 | 2018-07-06 11:24 | evanschmidt013 | EDITED RUN ONE (April 27, 1971) |
20505 | 2018-07-06 11:23 | evanschmidt013 | ADDED RUN ONE (April 27, 1971) |
20505 | 2018-07-06 11:20 | evanschmidt013 | EDITED WELL METADATA |
20505 | 2018-07-06 11:19 | evanschmidt013 | TAKEN |
20505 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02947077