QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1973-04-23 |
Abandon date | 2001-01-12 |
Borehole orientation | Vertical |
Measured depth | 1670.000 |
True vertical depth | |
Tperf | 1237.000 |
Bperf | 1670.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1973-04-25 |
Run number | ONE |
Driller depth | 1670.000 |
Logger depth | 1668.000 |
Log bottom | 1667.000 |
Log top | 45.000 |
Casing size | 14.000 |
Bit size | 12.250 |
Mud type | GEL WATER |
Mud density | 70.00 |
Mud visc (plastic) | |
Mud visc (funnel) | 50.00 |
Mud ph | 8.40 |
Mud fluid loss | 10.00 |
Sample source | CIRC |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.000 |
Operating rig time | |
Notes | FLUID LOSS IN CC |
54293 | 2018-10-25 13:47 | dakota | CLOSED, UNHANDED |
54293 | 2018-10-25 13:47 | dakota | EDITED RUN ONE (April 25, 1973) |
54293 | 2018-10-25 13:46 | dakota | EDITED WELL METADATA |
54293 | 2018-10-25 13:44 | dakota | TAKEN |
54293 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
17111 | 2018-06-29 08:45 | sgainer | CLOSED, UNHANDED |
17111 | 2018-06-29 08:42 | sgainer | EDITED RUN ONE (April 25, 1973) |
17111 | 2018-06-29 08:42 | sgainer | ADDED RUN ONE (April 25, 1973) |
17111 | 2018-06-29 08:41 | sgainer | EDITED WELL METADATA |
17111 | 2018-06-29 08:39 | sgainer | TAKEN |
17111 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02947716