QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1985-11-18 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 3116.000 |
True vertical depth | 3096.310 |
Tperf | 2602.000 |
Bperf | 2655.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | SCHLUMBERGER | SCHLUMBERGER |
Tool | DUAL LATEROLOG MSFL W/LIN CORR | LITHO DENSITY DUAL NEUTRON POROSITY |
Date | 1985-11-24 | 1985-11-24 |
Run number | 1 | 1 |
Driller depth | 3116.000 | 3116.000 |
Logger depth | 3114.000 | 3114.000 |
Log bottom | 3099.000 | 3111.000 |
Log top | 135.000 | 135.000 |
Casing size | 10.750 | 10.750 |
Bit size | 9.875 | 9.875 |
Mud type | CYPAN | CYPAN |
Mud density | 66.00 | 66.00 |
Mud visc (plastic) | ||
Mud visc (funnel) | 41.00 | 41.00 |
Mud ph | 8.30 | 8.30 |
Mud fluid loss | 5.80 | 5.80 |
Sample source | FLOWLINE | FLOWLINE |
Circulation stopped time | 20:15:00 | 20:15:00 |
Logger on bottom time | 23:47:00 | 03:48:00 |
Time since circulation | ||
Operating rig time | ||
Notes | FLUID LOSS IN C3 | FLUID LOSS IN C3 |
54599 | 2019-01-25 15:50 | ashley | CLOSED, UNHANDED |
54599 | 2019-01-25 15:50 | ashley | EDITED RUN 1 (Nov. 24, 1985) |
54599 | 2019-01-25 15:47 | ashley | EDITED RUN 1 (Nov. 24, 1985) |
54599 | 2019-01-25 15:41 | ashley | EDITED WELL METADATA |
54599 | 2019-01-25 15:35 | ashley | TAKEN |
54599 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
17609 | 2018-07-05 11:25 | sgainer | CLOSED, UNHANDED |
17609 | 2018-07-05 11:25 | sgainer | EDITED RUN 1 (Nov. 24, 1985) |
17609 | 2018-07-05 11:24 | sgainer | ADDED RUN 1 (Nov. 24, 1985) |
17609 | 2018-07-05 11:22 | sgainer | EDITED RUN 1 (Nov. 24, 1985) |
17609 | 2018-07-05 11:22 | sgainer | EDITED RUN 1 (Nov. 24, 1985) |
17609 | 2018-07-05 11:21 | sgainer | ADDED RUN 1 (Nov. 24, 1985) |
17609 | 2018-07-05 11:16 | sgainer | EDITED WELL METADATA |
17609 | 2018-07-05 11:15 | sgainer | TAKEN |
17609 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 07920596