QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 2000-06-23 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1817.000 |
True vertical depth | 1810.530 |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | HALLIBURTON | Halliburton |
Tool | COMPENSATED DENSITY DUAL SPACED NEUTRON WATER SATURATION | HIGH RES. INDUCTION CDL/DSN_U DIELECTRIC |
Date | 2000-06-25 | 2000-06-25 |
Run number | ONE | ONE |
Driller depth | 1817.000 | 1817.000 |
Logger depth | 1820.000 | 1820.000 |
Log bottom | 1810.000 | 1810.000 |
Log top | 80.000 | 80.000 |
Casing size | 14.000 | 14.000 |
Bit size | 7.875 | 7.875 |
Mud type | GEL/DRISPAC | GEL/DRISPAC |
Mud density | 9.00 | 9.00 |
Mud visc (plastic) | 45.00 | 45.00 |
Mud visc (funnel) | ||
Mud ph | 9.00 | 9.00 |
Mud fluid loss | 8.20 | 8.20 |
Sample source | FLOWLINE | FLOWLINE |
Circulation stopped time | 03:00:00 | |
Logger on bottom time | 06:30:00 | 06:30:00 |
Time since circulation | 3.000 | |
Operating rig time | ||
Notes |
55027 | 2018-11-06 14:24 | ashley | CLOSED, UNHANDED |
55027 | 2018-11-06 14:24 | ashley | EDITED RUN ONE (June 25, 2000) |
55027 | 2018-11-06 14:20 | ashley | EDITED RUN ONE (June 25, 2000) |
55027 | 2018-11-06 14:18 | ashley | EDITED RUN ONE (June 25, 2000) |
55027 | 2018-11-06 14:17 | ashley | ADDED RUN ONE (June 25, 2000) |
55027 | 2018-11-06 14:13 | ashley | EDITED WELL METADATA |
55027 | 2018-11-06 14:09 | ashley | TAKEN |
55027 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
18365 | 2018-07-13 06:56 | sgainer | CLOSED, UNHANDED |
18365 | 2018-07-13 06:56 | sgainer | EDITED RUN ONE (June 25, 2000) |
18365 | 2018-07-13 06:56 | sgainer | EDITED RUN ONE (June 25, 2000) |
18365 | 2018-07-13 06:55 | sgainer | ADDED RUN ONE (June 25, 2000) |
18365 | 2018-07-13 06:54 | sgainer | EDITED WELL METADATA |
18365 | 2018-07-13 06:52 | sgainer | TAKEN |
18365 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 03012807