QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1964-10-05 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1320.000 |
True vertical depth | |
Tperf | 349.000 |
Bperf | 1223.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | PAN GEO ATLAS CORP. | PAN GEO ATLAS CORP. |
Tool | INDUCTION ELECTRICAL LOG | Induction Electrical Log |
Date | 1964-10-07 | 1964-10-09 |
Run number | ONE | TWO |
Driller depth | 950.000 | 1320.000 |
Logger depth | 947.000 | 1318.000 |
Log bottom | 941.000 | 1312.000 |
Log top | 56.000 | 941.000 |
Casing size | 11.750 | 11.750 |
Bit size | 10.625 | 10.625 |
Mud type | CLAYBASE MUD | CLAYBASE MUD |
Mud density | 72.00 | 71.00 |
Mud visc (plastic) | 58.00 | 44.00 |
Mud visc (funnel) | ||
Mud ph | 8.00 | 8.00 |
Mud fluid loss | 5.50 | 55.00 |
Sample source | FLOWLINE | FLOWLINE |
Circulation stopped time | ||
Logger on bottom time | ||
Time since circulation | 1.500 | 1.500 |
Operating rig time | ||
Notes |
55122 | 2018-11-08 10:46 | ashley | CLOSED, UNHANDED |
55122 | 2018-11-08 10:46 | ashley | EDITED RUN TWO (Oct. 9, 1964) |
55122 | 2018-11-08 10:44 | ashley | ADDED RUN TWO (Oct. 9, 1964) |
55122 | 2018-11-08 10:42 | ashley | EDITED RUN ONE (Oct. 7, 1964) |
55122 | 2018-11-08 10:39 | ashley | EDITED WELL METADATA |
55122 | 2018-11-08 10:36 | ashley | TAKEN |
55122 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
18441 | 2018-07-13 11:43 | gbessette | CLOSED, UNHANDED |
18441 | 2018-07-13 11:43 | gbessette | EDITED RUN ONE (Oct. 7, 1964) |
18441 | 2018-07-13 11:36 | gbessette | ADDED RUN ONE (Oct. 7, 1964) |
18441 | 2018-07-13 11:31 | gbessette | EDITED WELL METADATA |
18441 | 2018-07-13 11:28 | gbessette | EDITED WELL METADATA |
18441 | 2018-07-13 11:25 | gbessette | TAKEN |
18441 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02921795