QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1986-10-17 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1911.000 |
True vertical depth | 1900.700 |
Tperf | 1530.000 |
Bperf | 1836.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GEARHART |
Tool | DUAL INDUCTION LATEROLOG |
Date | 1986-10-19 |
Run number | One |
Driller depth | 1911.000 |
Logger depth | 1910.000 |
Log bottom | 1908.000 |
Log top | 50.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | CYPAN |
Mud density | 69.00 |
Mud visc (plastic) | 44.00 |
Mud visc (funnel) | |
Mud ph | 7.00 |
Mud fluid loss | 6.00 |
Sample source | Flowline |
Circulation stopped time | 19:30:00 |
Logger on bottom time | 20:49:00 |
Time since circulation | |
Operating rig time | |
Notes | fluid loss in cc |
55125 | 2018-11-08 10:13 | ashley | CLOSED, UNHANDED |
55125 | 2018-11-08 10:13 | ashley | EDITED RUN One (Oct. 19, 1986) |
55125 | 2018-11-08 10:11 | ashley | EDITED WELL METADATA |
55125 | 2018-11-08 10:08 | ashley | TAKEN |
55125 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
18518 | 2018-07-13 12:00 | powen | CLOSED, UNHANDED |
18518 | 2018-07-13 11:59 | powen | EDITED RUN One (Oct. 19, 1986) |
18518 | 2018-07-13 11:57 | powen | ADDED RUN One (Oct. 19, 1986) |
18518 | 2018-07-13 11:55 | powen | EDITED WELL METADATA |
18518 | 2018-07-13 11:49 | powen | TAKEN |
18518 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02978867