QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1973-12-02 |
Abandon date | 1990-06-13 |
Borehole orientation | Vertical |
Measured depth | 1487.000 |
True vertical depth | |
Tperf | 1032.000 |
Bperf | 1480.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1973-12-03 |
Run number | ONE |
Driller depth | 1487.000 |
Logger depth | 1488.000 |
Log bottom | 1487.000 |
Log top | 39.000 |
Casing size | 12.000 |
Bit size | 9.875 |
Mud type | CLAY BASE |
Mud density | 69.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | CIRC. |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.500 |
Operating rig time | |
Notes |
55296 | 2018-11-13 16:06 | ashley | CLOSED, UNHANDED |
55296 | 2018-11-13 16:06 | ashley | EDITED RUN ONE (Dec. 3, 1973) |
55296 | 2018-11-13 16:04 | ashley | EDITED WELL METADATA |
55296 | 2018-11-13 16:01 | ashley | TAKEN |
55296 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
18744 | 2018-07-18 15:49 | powen | CLOSED, UNHANDED |
18744 | 2018-07-18 15:49 | powen | EDITED RUN ONE (Dec. 3, 1973) |
18744 | 2018-07-18 15:48 | powen | ADDED RUN ONE (Dec. 3, 1973) |
18744 | 2018-07-18 15:46 | powen | EDITED WELL METADATA |
18744 | 2018-07-18 15:43 | powen | TAKEN |
18744 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02948118