QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1976-10-17 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1270.000 |
True vertical depth | |
Tperf | 832.000 |
Bperf | 1130.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1976-10-18 |
Run number | ONE |
Driller depth | 1270.000 |
Logger depth | 1272.000 |
Log bottom | 1271.000 |
Log top | 34.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | CHEM GEL |
Mud density | 69.00 |
Mud visc (plastic) | |
Mud visc (funnel) | 46.00 |
Mud ph | 7.90 |
Mud fluid loss | 5.00 |
Sample source | FLOWLINE |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.000 |
Operating rig time | |
Notes |
55918 | 2018-11-25 15:39 | dakota | CLOSED, UNHANDED |
55918 | 2018-11-25 15:39 | dakota | EDITED RUN ONE (Oct. 18, 1976) |
55918 | 2018-11-25 15:36 | dakota | EDITED WELL METADATA |
55918 | 2018-11-25 15:32 | dakota | TAKEN |
55918 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
19898 | 2018-07-27 09:22 | ahowery | CLOSED, UNHANDED |
19898 | 2018-07-27 09:22 | ahowery | EDITED RUN ONE (Oct. 18, 1976) |
19898 | 2018-07-27 09:21 | ahowery | ADDED RUN ONE (Oct. 18, 1976) |
19898 | 2018-07-27 09:16 | ahowery | EDITED WELL METADATA |
19898 | 2018-07-27 09:13 | ahowery | TAKEN |
19898 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02954013