QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1972-07-07 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1270.000 |
True vertical depth | |
Tperf | 699.000 |
Bperf | 1268.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL |
Tool | INDUCTION ELECTRICAL LOG |
Date | 1972-07-08 |
Run number | ONE |
Driller depth | 1270.000 |
Logger depth | 1271.000 |
Log bottom | 1270.000 |
Log top | 30.000 |
Casing size | 11.750 |
Bit size | 10.625 |
Mud type | GEL-WATER |
Mud density | 69.00 |
Mud visc (plastic) | 47.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | PIT |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 0.500 |
Operating rig time | |
Notes |
56627 | 2018-12-01 15:04 | diana | CLOSED, UNHANDED |
56627 | 2018-12-01 15:04 | diana | EDITED RUN ONE (July 8, 1972) |
56627 | 2018-12-01 15:00 | diana | EDITED WELL METADATA |
56627 | 2018-12-01 15:00 | diana | EDITED WELL METADATA |
56627 | 2018-12-01 14:55 | diana | TAKEN |
56627 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
20968 | 2018-08-03 06:27 | sgainer | CLOSED, UNHANDED |
20968 | 2018-08-03 06:26 | sgainer | EDITED RUN ONE (July 8, 1972) |
20968 | 2018-08-03 06:26 | sgainer | ADDED RUN ONE (July 8, 1972) |
20968 | 2018-08-03 06:25 | sgainer | EDITED WELL METADATA |
20968 | 2018-08-03 06:23 | sgainer | TAKEN |
20968 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02946903