QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1986-09-01 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1154.000 |
True vertical depth | 1150.040 |
Tperf | 874.000 |
Bperf | 1103.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Welex |
Tool | DUAL INDUCTION GUARD LOG |
Date | 1986-09-02 |
Run number | One |
Driller depth | 1154.000 |
Logger depth | 1152.000 |
Log bottom | 1149.000 |
Log top | 48.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | Drispac |
Mud density | 69.00 |
Mud visc (plastic) | 41.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | |
Sample source | Circulated |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | 1.500 |
Operating rig time | |
Notes |
56869 | 2018-12-08 13:00 | dakota | CLOSED, UNHANDED |
56869 | 2018-12-08 13:00 | dakota | EDITED RUN One (Sept. 2, 1986) |
56869 | 2018-12-08 12:58 | dakota | EDITED WELL METADATA |
56869 | 2018-12-08 12:54 | dakota | TAKEN |
56869 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
13399 | 2018-01-17 16:50 | fatimaburhan | CLOSED, UNHANDED |
13399 | 2018-01-17 16:50 | fatimaburhan | EDITED RUN One (Sept. 2, 1986) |
13399 | 2018-01-17 16:49 | fatimaburhan | ADDED RUN One (Sept. 2, 1986) |
13399 | 2018-01-17 16:38 | fatimaburhan | TAKEN |
13399 | 2018-01-17 16:38 | fatimaburhan | UNHANDED |
13399 | 2018-01-17 15:27 | fatimaburhan | TAKEN |
13399 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02978551