QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1998-01-06 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1580.000 |
True vertical depth | 1451.000 |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes | NEVER PRODUCED |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP/TEMP DENSITY/NEUTRON/GR |
Date | 1998-01-08 |
Run number | 1 |
Driller depth | 1580.000 |
Logger depth | 1573.000 |
Log bottom | 1565.000 |
Log top | 54.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | GEL/ DRILL PAC |
Mud density | 8.90 |
Mud visc (plastic) | 40.00 |
Mud visc (funnel) | |
Mud ph | 7.50 |
Mud fluid loss | |
Sample source | FLOWLINE |
Circulation stopped time | 16:00:00 |
Logger on bottom time | 18:26:00 |
Time since circulation | |
Operating rig time | |
Notes |
57116 | 2018-12-13 16:06 | dakota | CLOSED, UNHANDED |
57116 | 2018-12-13 16:06 | dakota | EDITED RUN 1 (Jan. 8, 1998) |
57116 | 2018-12-13 16:04 | dakota | EDITED WELL METADATA |
57116 | 2018-12-13 15:59 | dakota | TAKEN |
57116 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
13107 | 2018-01-12 17:29 | powen | CLOSED, UNHANDED |
13107 | 2018-01-12 17:29 | powen | EDITED RUN 1 (Jan. 8, 1998) |
13107 | 2018-01-12 17:28 | powen | EDITED RUN 1 (Jan. 8, 1998) |
13107 | 2018-01-12 17:27 | powen | ADDED RUN 1 (Jan. 8, 1998) |
13107 | 2018-01-12 17:23 | powen | EDITED WELL METADATA |
13107 | 2018-01-12 17:19 | powen | TAKEN |
13107 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03009510