QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1998-09-06 |
Abandon date | 2014-05-08 |
Borehole orientation | Vertical |
Measured depth | 1900.000 |
True vertical depth | |
Tperf | |
Bperf | |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP NEUTRON/DENSITY/GR/ML |
Date | 1998-09-07 |
Run number | 1 |
Driller depth | 1900.000 |
Logger depth | 1901.000 |
Log bottom | 1893.000 |
Log top | 52.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | PAC-L/QUIK-GEL |
Mud density | 8.90 |
Mud visc (plastic) | |
Mud visc (funnel) | 39.00 |
Mud ph | 7.60 |
Mud fluid loss | 8.00 |
Sample source | FLOWLINE |
Circulation stopped time | 22:00:00 |
Logger on bottom time | 23:50:00 |
Time since circulation | |
Operating rig time | |
Notes | Fluid loss is in C3 |
57211 | 2018-12-17 13:21 | ashley | CLOSED, UNHANDED |
57211 | 2018-12-17 13:20 | ashley | EDITED RUN 1 (Sept. 7, 1998) |
57211 | 2018-12-17 13:20 | ashley | EDITED RUN 1 (Sept. 7, 1998) |
57211 | 2018-12-17 13:15 | ashley | EDITED WELL METADATA |
57211 | 2018-12-17 13:12 | ashley | TAKEN |
57211 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
13749 | 2018-01-22 21:48 | powen | CLOSED, UNHANDED |
13749 | 2018-01-22 21:48 | powen | EDITED RUN 1 (Sept. 7, 1998) |
13749 | 2018-01-22 21:47 | powen | EDITED RUN 1 (Sept. 7, 1998) |
13749 | 2018-01-22 21:46 | powen | ADDED RUN 1 (Sept. 7, 1998) |
13749 | 2018-01-22 21:42 | powen | EDITED WELL METADATA |
13749 | 2018-01-22 21:36 | powen | TAKEN |
13749 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03012083