QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1997-11-03 |
Abandon date | |
Borehole orientation | Directional |
Measured depth | 1263.000 |
True vertical depth | 1260.360 |
Tperf | 1028.000 |
Bperf | 1261.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Schlumberger |
Tool | PLATFORM EXPRESS ARRAY INDUCTION/SP/ML DENSITY/NEUTRON/GR/TEMP |
Date | 1997-11-05 |
Run number | 1 |
Driller depth | 1263.000 |
Logger depth | 1262.000 |
Log bottom | 1254.000 |
Log top | 46.000 |
Casing size | 13.375 |
Bit size | 9.875 |
Mud type | GEL/PAC |
Mud density | 8.90 |
Mud visc (plastic) | 44.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 8.00 |
Sample source | FLOWLINE |
Circulation stopped time | 07:00:00 |
Logger on bottom time | 10:45:00 |
Time since circulation | |
Operating rig time | |
Notes |
57237 | 2019-01-05 15:36 | dakota | CLOSED, UNHANDED |
57237 | 2019-01-05 15:36 | dakota | EDITED RUN 1 (Nov. 5, 1997) |
57237 | 2019-01-05 15:30 | dakota | EDITED WELL METADATA |
57237 | 2019-01-05 15:18 | dakota | TAKEN |
57237 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
13761 | 2018-01-23 16:15 | powen | CLOSED, UNHANDED |
13761 | 2018-01-23 16:15 | powen | EDITED RUN 1 (Nov. 5, 1997) |
13761 | 2018-01-23 16:14 | powen | EDITED RUN 1 (Nov. 5, 1997) |
13761 | 2018-01-23 16:12 | powen | ADDED RUN 1 (Nov. 5, 1997) |
13761 | 2018-01-23 16:04 | powen | EDITED WELL METADATA |
13761 | 2018-01-23 16:02 | powen | TAKEN |
13761 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 03009288