QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1972-11-19 |
Abandon date | |
Borehole orientation | Vertical |
Measured depth | 1646.000 |
True vertical depth | |
Tperf | 1179.000 |
Bperf | 1646.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GO INTERNATIONAL | Schlumberger |
Tool | INDUCTION ELECTRICAL LOG | Platform Express Array Induction/SP/ML/DENSITY/NEUTRON/GR/TEMP |
Date | 1972-11-20 | 1996-06-06 |
Run number | ONE | ONE |
Driller depth | 1481.000 | 1725.000 |
Logger depth | 1480.000 | 1725.000 |
Log bottom | 1479.000 | 1717.000 |
Log top | 28.000 | 1095.000 |
Casing size | 11.750 | 7.000 |
Bit size | 10.625 | 6.250 |
Mud type | CLAY BASE | Gel/Aquapac |
Mud density | 69.00 | 9.20 |
Mud visc (plastic) | 48.00 | 47.00 |
Mud visc (funnel) | ||
Mud ph | 7.20 | 8.00 |
Mud fluid loss | 5.00 | 6.90 |
Sample source | CIRCULATION | FLOWLINE |
Circulation stopped time | 04:30:00 | |
Logger on bottom time | 09:45:00 | |
Time since circulation | ||
Operating rig time | ||
Notes |
57659 | 2019-01-04 12:43 | dakota | CLOSED, UNHANDED |
57659 | 2019-01-04 12:43 | dakota | EDITED RUN ONE (June 6, 1996) |
57659 | 2019-01-04 12:42 | dakota | EDITED RUN ONE (June 6, 1996) |
57659 | 2019-01-04 12:41 | dakota | ADDED RUN ONE (June 6, 1996) |
57659 | 2019-01-04 12:37 | dakota | EDITED RUN ONE (Nov. 20, 1972) |
57659 | 2019-01-04 12:32 | dakota | EDITED WELL METADATA |
57659 | 2019-01-04 12:28 | dakota | TAKEN |
57659 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
14656 | 2018-02-07 12:07 | ellie | CLOSED, UNHANDED |
14656 | 2018-02-07 12:07 | ellie | ADDED RUN ONE (Nov. 20, 1972) |
14656 | 2018-02-07 12:04 | ellie | EDITED WELL METADATA |
14656 | 2018-02-07 11:59 | ellie | TAKEN |
14656 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02947409