QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1992-11-17 |
Abandon date | 2008-06-25 |
Borehole orientation | Directional |
Measured depth | 1380.000 |
True vertical depth | 1374.810 |
Tperf | 1120.000 |
Bperf | 1321.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GEARHART |
Tool | DUAL INDUCTION LATEROLOG |
Date | 1981-01-09 |
Run number | ONE |
Driller depth | 1380.000 |
Logger depth | 1381.000 |
Log bottom | 1380.000 |
Log top | 281.000 |
Casing size | 11.750 |
Bit size | 9.875 |
Mud type | GEL |
Mud density | 67.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | 7.80 |
Mud fluid loss | 5.00 |
Sample source | FLOWLINE |
Circulation stopped time | 10:30:00 |
Logger on bottom time | 12:15:00 |
Time since circulation | |
Operating rig time | |
Notes |
58102 | 2019-01-05 12:23 | dakota | CLOSED, UNHANDED |
58102 | 2019-01-05 12:23 | dakota | EDITED RUN ONE (Jan. 9, 1981) |
58102 | 2019-01-05 12:21 | dakota | EDITED WELL METADATA |
58102 | 2019-01-05 12:17 | dakota | TAKEN |
58102 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
15796 | 2018-02-27 16:42 | powen | CLOSED, UNHANDED |
15796 | 2018-02-27 16:42 | powen | EDITED RUN ONE (Jan. 9, 1981) |
15796 | 2018-02-27 16:42 | powen | EDITED RUN ONE (Jan. 9, 1981) |
15796 | 2018-02-27 16:39 | powen | ADDED RUN ONE (Jan. 9, 1981) |
15796 | 2018-02-27 16:37 | powen | EDITED WELL METADATA |
15796 | 2018-02-27 16:37 | powen | EDITED WELL METADATA |
15796 | 2018-02-27 16:34 | powen | TAKEN |
15796 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02962598