QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1969-04-06 |
Abandon date | 2007-10-30 |
Borehole orientation | Vertical |
Measured depth | 1282.000 |
True vertical depth | 1280.380 |
Tperf | 869.000 |
Bperf | 1282.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | Go-Western |
Tool | Electric Log |
Date | 1969-04-07 |
Run number | ONE |
Driller depth | 1265.000 |
Logger depth | 1264.000 |
Log bottom | 1263.000 |
Log top | 88.000 |
Casing size | 11.750 |
Bit size | 10.625 |
Mud type | CLAY BASE |
Mud density | 68.00 |
Mud visc (plastic) | 45.00 |
Mud visc (funnel) | |
Mud ph | |
Mud fluid loss | 5.00 |
Sample source | CIRC. |
Circulation stopped time | |
Logger on bottom time | |
Time since circulation | |
Operating rig time | |
Notes | fluid loss in cc |
58217 | 2019-01-08 14:58 | ashley | CLOSED, UNHANDED |
58217 | 2019-01-08 14:58 | ashley | EDITED RUN ONE (April 7, 1969) |
58217 | 2019-01-08 14:55 | ashley | EDITED WELL METADATA |
58217 | 2019-01-08 14:45 | ashley | TAKEN |
58217 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
18740 | 2018-07-17 13:55 | powen | CLOSED, UNHANDED |
18740 | 2018-07-17 13:55 | powen | EDITED RUN ONE (April 7, 1969) |
18740 | 2018-07-17 13:53 | powen | ADDED RUN ONE (April 7, 1969) |
18740 | 2018-07-17 13:47 | powen | EDITED WELL METADATA |
18740 | 2018-07-17 13:45 | powen | TAKEN |
18740 | 2018-01-04 20:36 | whdc | TASK CREATED |
Well 02943593