QC all data (well construction, run header, g-log curves, mud/temperature).
This task is closed and unheld.
Name | |
Spud date | 1985-06-12 |
Abandon date | 2000-01-21 |
Borehole orientation | Vertical |
Measured depth | 660.000 |
True vertical depth | |
Tperf | 455.000 |
Bperf | 660.000 |
Water geochem | |
No well data | |
Glog unavailable | |
Notes |
Service company | GEARHART |
Tool | DUAL INDUCTION LATEROLOG |
Date | 1985-06-12 |
Run number | ONE |
Driller depth | 660.000 |
Logger depth | 664.000 |
Log bottom | 660.000 |
Log top | 39.000 |
Casing size | 10.750 |
Bit size | 9.875 |
Mud type | CYPAN-BENEX |
Mud density | 69.00 |
Mud visc (plastic) | 44.00 |
Mud visc (funnel) | |
Mud ph | 8.00 |
Mud fluid loss | 6.00 |
Sample source | FLOWLINE |
Circulation stopped time | 12:30:00 |
Logger on bottom time | 13:05:00 |
Time since circulation | |
Operating rig time | |
Notes | Fluid loss: cc |
58575 | 2019-01-15 10:44 | dakota | CLOSED, UNHANDED |
58575 | 2019-01-15 10:44 | dakota | EDITED RUN ONE (June 12, 1985) |
58575 | 2019-01-15 10:43 | dakota | EDITED WELL METADATA |
58575 | 2019-01-15 10:41 | dakota | TAKEN |
58575 | 2018-08-09 13:28 | e.haugen | TASK CREATED |
16798 | 2018-06-27 14:15 | robin | CLOSED, UNHANDED |
16798 | 2018-06-27 14:14 | robin | EDITED RUN ONE (June 12, 1985) |
16798 | 2018-06-27 14:12 | robin | ADDED RUN ONE (June 12, 1985) |
16798 | 2018-06-27 14:08 | robin | EDITED WELL METADATA |
16798 | 2018-06-27 14:01 | robin | TAKEN |
16798 | 2018-01-04 20:35 | whdc | TASK CREATED |
Well 02975113